Specifications include, but are not limited to: THIS PROJECT INCLUDES SECURITY UPGRADES AND INFRASTRUCTURE AT THE ACCOMACK COUNTY EMERGENCY OPERATIONS CENTER. WORK TO BE DONE UNDER THIS CONTRACT INCLUDES, BUT IS NOT LIMITED TO THE FOLLOWING: · INSTALL AN AUTOMATED SECURITY GATE CROSS THE DRIVEWAY. · INSTALL CHAIN LINK FENCE PANELS TO CREATE A SPACE BETWEEN THE ROAD AND NEW GATE FOR VEHICLES TO PULL OF THE ROAD AND ACTIVATE THE GATE · INSTALL INFRASTUCTURE (CONDUITS, RISERS, PULL STRINGS AND JUNCTON BOXES) FOR CAMERAS AND CONTROLLERS THAT WILL BE PROVIDED AND INSTALLED BY OTHERS. · PROVIDE POWER SOURCE FOR GATE OPERATOR AND RELATED SWITCHES AS SHOWN ON THESE PLANS, FROM EXISTING PANEL ON SITE. · REMOVE EXISTING MANUAL GATE UPON COMPLETION AND SATISFACTORY TESTING AND OPERATION OF AUTOMATED GATE. MANUAL GATE SHALL REMAIN OPERATIONAL THROUGHOUT THE PROPOSED CONSTRUCTION, ALLOWING THE SITE TO BE SECURED. · CONTRACTOR SHALL COORDINATE WORK AND SCHEDULE WITH COUNTY PERSONNEL AND THEIR SELECTED SECURITY SYSTEMS CONTRACTOR.