Specifications include, but are not limited to: construction of a new entrance into Camp Pendleton, State Military Reservation(SMR) off of General Booth Boulevard and construction of a new Main Gate Access Control Point (ACP). The newMain Gate ACP will provide the Anti-Terrorism / Force Protection (ATFP) measures required to adequately controlvehicular and pedestrian traffic and to perform required visitor processing, identification (ID) checks and vehicleinspections. The Main Gate ACP and its associated facilities are integral to the SMR’s security. The primary facilitiesinclude a visitor center, a guard booth, an overhead protection shelter, a vehicle inspection area with a driver holdingbooth, a two-story overwatch tower, and a backup/emergency generator. Supporting components will include utilityservice extension, roads, sidewalks, curbs, fencing, barriers, gutters, storm drainage, parking areas, static displays (ofmilitary vehicles), a digital installation information sign, site lighting, landscaping, and site improvements.There are four distinct buildings included in this project, as follows:1.Visitors Center1 story1,000 sf2.Guard Booth1 story200 sf3.Driver Holding Booth1 story100 sf4.Overwatch Guard Tower2 stories220 sf.