The contractor shall provide all labor, supervision, equipment, tools, materials, and incidentals necessary to remove, upgrade, and replace identified sidewalk, curb, gutter, driveway entrances, and ADA facilities at the specified locations to include site restoration after construction is completed. All work described herein and in the Related Documents is included as part of this solicitation unless otherwise specified. The scope of services generally includes, but is not necessarily limited to, the following: Removal and replacement of sidewalk; Removal and replacement of curbing; Removal and replacement of curb and gutter; Removal and replacement of driveway entrance; Removal and replacement of ADA ramps; Removal and replacement of asphalt; Altering existing structures including water meters, valves, catch basins, etc. Provision of all necessary traffic control, with all such efforts in full compliance with the American with Disabilities Act and with standards and guidelines set forth in the Virginia Work Area Protection Manual