0010 305SP20-0003 AGR. BASE MAT. TY.I OR II NO. 21A OR 21B TON 870.390 _________._____ _________._____ ATTD 0020 310SD20-0001 TACK COAT GAL 26,600.000 _________._____ _________._____ 310 0030 315SD20-0015 RUMBLE STRIP CYLINDRICAL ASPHALT LF 42,306.000 _________._____ _________._____ 315 0040 315SD20-0043 ASPH. CONC. TY. IM-19.0D MAINT TON 1,002.000 _________._____ _________._____ 315 0050 315SP20-0006 PAVEMENT SHOULDER WEDGE PREP. CONST LF 34,346.000 _________._____ _________._____ ATTD 0060 315SP20-0051 ASPH. CONC. BMD P+VO SM12.5D TON 28,191.590 _________._____ _________._____ 315 0070 512SD20-0027 FLAGGER SERVICE HR 706.000 _________._____ _________._____ 512 0080 512SD20-0047 TEMP. PVMT MRKG TY. A, 6" LF 167,375.000 _________._____ _________._____ 512 0090 512SD20-0049 TEMP. PVMT MRKG TY. A, 12" LF 560.000 _________._____ _________._____ 512 0100 512SD20-0052 TEMP. PVMT. SYMB. MRKG SNGL TURN ARROW TY. A EA 33.000 _________._____ _________._____ 512 0110 512SP20-0002 MAINTENANCE OF TRAFFIC MOT FOR UPC 127551 LUMP SUM LUMP SUM _________._____ ATTD