-
- OBJECTIVE
The main objective for this statement of work is to have the 33 cylinders that have reached the end-of-life service requirements replaced with matching configurations of the G1 fire responder packs. These cylinders are required to support the above TPO’s in firefighting. These specifications match the current cylinders in use and will provide the needed on-air rating and dove tail configuration as specified per SFLC Engineering Advisory 002-25, Maintenance Procedure Card R-Q-17849, and Naval Ships Technical Manual 077, Personal Protective Equipment.
2.0 SPECIFIC REQUIREMENTS/TASKS
2.1 Contractor will supply thirty-three (33) G1 low profile cylinders with the dove tail configuration and rated at 4,500 PSI.
2.2 FOB Destination: Contractor will be responsible for freight transportation to TRAINING CENTER YORKTOWN (TCY).