0010 305SP20-0003 AGR. BASE MAT. TY.I OR II NO. 21A OR 21B TON 220.700 _________._____ _________._____ ATTD 0020 310SD20-0001 TACK COAT GAL 31,433.000 _________._____ _________._____ 310 0030 315SD20-0015 RUMBLE STRIP CYLINDRICAL ASPHALT LF 114,680.000 _________._____ _________._____ 315 0040 315SP20-0006 PAVEMENT SHOULDER WEDGE PREP. CONST LF 75,451.000 _________._____ _________._____ ATTD 0050 315SP20-0051 ASPH. CONC. BMD P+VO SM12.5D TON 33,846.550 _________._____ _________._____ 315 0060 512SD20-0027 FLAGGER SERVICE HR 771.000 _________._____ _________._____ 512 0070 512SD20-0046 TEMP. PVMT MRKG TY. A, 4" LF 349,862.000 _________._____ _________._____ 512 0080 512SD20-0049 TEMP. PVMT MRKG TY. A, 12" LF 980.000 _________._____ _________._____ 512 0090 512SP20-0002 MAINTENANCE OF TRAFFIC MOT LUMP SUM LUMP SUM _________._____ 512 0100 515SD20-0013 FLEXIBLE PAVE.PLANING 0"- 2" SY 304,073.590 _________._____ _________._____ 515