0010 305SP20-0003 AGR. BASE MAT. TY.I OR II NO. 21A OR 21B TON 50.000 _________._____ _________._____ ATTD 0020 310SD20-0001 TACK COAT GAL 21,726.000 _________._____ _________._____ 310 0030 315SP20-0006 PAVEMENT SHOULDER WEDGE PREP. CONST LF 60,658.000 _________._____ _________._____ ATTD 0040 315SP20-0051 ASPH. CONC. BMD P+VO SM12.5D TON 25,134.140 _________._____ _________._____ 315 0050 512SD20-0027 FLAGGER SERVICE HR 600.000 _________._____ _________._____ 512 0060 512SD20-0046 TEMP. PVMT MRKG TY. A, 4" LF 345,636.000 _________._____ _________._____ 512 0070 512SD20-0049 TEMP. PVMT MRKG TY. A, 12" LF 2,558.000 _________._____ _________._____ 512 0080 512SP20-0002 MAINTENANCE OF TRAFFIC MOT LUMP SUM LUMP SUM _________._____ 512 0090 515SD20-0013 FLEXIBLE PAVE.PLANING 0"- 2" SY 227,491.730 _________._____ _________._____ 515 0100 700SD20-0118 14/1 CONDUCTOR CABLE ENCLOSED LF 15,480.000 _________._____ _________._____ 700 0110 700SD20-0182 CONDUIT PVC 1" LF 765.000 _________._____ _________._____ 700 0120 703SD20-0042 LOOP SAW CUT 3/8" LF 4,356.000 _________._____ _________._____ 703 0130 703SD20-0043 LOOP SAW CUT 5/8" LF 1,020.000 _________._____ _________._____