0010 305SP20-0003 AGR. BASE MAT. TY.I OR II NO. 21A OR 21B TON 444.790 _________._____ _________._____ ATTD 0020 310SD20-0001 TACK COAT GAL 19,078.040 _________._____ _________._____ 310 0030 315SP20-0006 PAVEMENT SHOULDER WEDGE PREP. CONST LF 48,262.000 _________._____ _________._____ ATTD 0040 315SP20-0049 ASPH. CONC. BMD P+VO SM9.5D TON 13,119.160 _________._____ _________._____ 315 0050 315SP20-0051 ASPH. CONC. BMD P+VO SM12.5D TON 6,882.930 _________._____ _________._____ 315 0060 323SD20-0030 TRAVEL LANE PATCHING (PATCH MIX TYPE) IM-19.0A PATCHING TON 1,507.000 _________._____ _________._____ 323 0070 512SD20-0027 FLAGGER SERVICE HR 2,053.000 _________._____ _________._____ 512 0080 512SD20-0042 ERADICATE LINEAR PVMT MRKG LF 64,006.000 _________._____ _________._____ 512 0090 512SD20-0043 ERADICATE NONLINEAR PVMT MRKG SF 150.000 _________._____ _________._____ 512 0100 512SD20-0046 TEMP. PVMT MRKG TY. A, 4" LF 384,380.000 _________._____ _________._____ 512 0110 512SD20-0049 TEMP. PVMT MRKG TY. A, 12" LF 840.000 _________._____ _________._____ 512 0120 512SP20-0002 MAINTENANCE OF TRAFFIC PLANT MIX LUMP SUM