0010 310SD20-0001 TACK COAT GAL 12,634.000 _________._____ _________._____ 310 0020 315SD20-0052 RUMBLE STRIP SINUSOIDAL ASPHALT LF 115,890.000 _________._____ _________._____ 315 0030 315SP20-0006 PAVEMENT SHOULDER WEDGE PREP. CONST LF 41,132.000 _________._____ _________._____ ATTD 0040 315SP20-0049 ASPH. CONC. BMD P+VO SM9.5D TON 18,367.040 _________._____ _________._____ 315 0050 315SP20-0051 ASPH. CONC. BMD P+VO SM12.5D TON 4,965.320 _________._____ _________._____ 315 0060 323SD20-0030 TRAVEL LANE PATCHING (PATCH MIX TYPE) IM-19.0A PATCHING TON 563.000 _________._____ _________._____ 323 0070 512SD20-0027 FLAGGER SERVICE HR 260.000 _________._____ _________._____ 512 0080 512SD20-0042 ERADICATE LINEAR PVMT MRKG LF 490.000 _________._____ _________._____ 512 0090 512SD20-0046 TEMP. PVMT MRKG TY. A, 4" LF 315,790.000 _________._____ _________._____ 512 0100 512SP20-0002 MAINTENANCE OF TRAFFIC PLANT MIX LUMP SUM LUMP SUM _________._____ ATTD 0110 515SD20-0013 FLEXIBLE PAVE.PLANING 0"- 2" SY 262,577.870 _________._____ _________._____ 515 0120 704SD20-0006 TYPE B CLASS I PVMT LINE MRKG 4" LF 736.000