0010 305SP20-0003 AGR. BASE MAT. TY.I OR II NO. 21A OR 21B TON 50.000 _________._____ _________._____ ATTD 0020 310SD20-0001 TACK COAT GAL 41,591.000 _________._____ _________._____ 310 0030 315SD20-0015 RUMBLE STRIP CYLINDRICAL ASPHALT LF 11,675.000 _________._____ _________._____ 315 0040 315SP20-0006 PAVEMENT SHOULDER WEDGE PREP. CONST LF 168,674.000 _________._____ _________._____ ATTD 0050 315SP20-0051 ASPH. CONC. BMD P+VO SM12.5D TON 36,378.190 _________._____ _________._____ 315 0060 323SD20-0030 TRAVEL LANE PATCHING (PATCH MIX TYPE) IM-19.0A TON 550.000 _________._____ _________._____ 323 0070 512SD20-0027 FLAGGER SERVICE HR 2,208.000 _________._____ _________._____ 512 0080 512SD20-0046 TEMP. PVMT MRKG TY. A, 4" LF 686,774.000 _________._____ _________._____ 512 0090 512SD20-0049 TEMP. PVMT MRKG TY. A, 12" LF 1,594.000 _________._____ _________._____ 512 0100 512SP20-0002 MAINTENANCE OF TRAFFIC MOT LUMP SUM LUMP SUM _________._____ 512 0110 515SD20-0013 FLEXIBLE PAVE.PLANING 0"- 2" SY 395,124.190 _________._____ _________._____ 515 0120 700SD20-0118 14/1 CONDUCTOR CABLE ENCLOSED LF 8,070.000 _________._____ _________._____ 700 0130 700SD20-0182 CONDUIT PVC 1" LF 375.000