• The Contractor shall furnish all labor, installation, supervision, equipment, tools, parts, and materials as necessary, to provide 13 replacement fire doors and hardware. • Installation dates must be scheduled in advance with project manager. All work must be completed during Charlottesville City Schools Summer Break (Starts 6/1/25 - Ends 8/12/25). Hollow Metal Door Specifications: • All doors shall have a minimum of 90 fire rating. • All hardware shall be UL listed for the opening. • Provide commercial-grade hollow metal doors for each opening. • Doors shall be in accordance with Steel Door Institute (SDI), UL & ANSI specifications. • Doors shall be 1 ¾” thick. • Doors shall be constructed of a minimum 16ga. • Doors shall be factory-prepped to receive all hardware listed and any incidental hardware required.