Specifications include, but are not limited to: • 8 Project Meetings The selected consultant will coordinate with the Lamoille County Planning Commission and project partners to schedule and participate in 8 meetings. This includes facilitating a combined kick off meeting, two site visit meetings (one in Cambridge Village and one in Jeffersonville), a check-in meeting with each governing Board (Cambridge Selectboard, Cambridge Village Trustees, and Jeffersonville Trustees), one regulatory review meeting of preliminary designs, and one community presentation meeting. • Stormwater Master Plan Assessment and Analysis The selected consultant will conduct the Stormwater Master Plan assessment and analysis based on input from the project partners. The assessment will cover a minimum of 12 acres. Data acquisition and problem areas should be documented in accordance with task 2 and 3 deliverables in Table 1 below. • 10 Preliminary Design Plans The selected consultant will develop preliminary design plans for 10 problem areas/ sites in accordance with the below locations. The level of preliminary design plans varies by proposed sites and study areas as described below. Design plans will include existing conditions and proposed improvements. See below for an outline of proposed preliminary design planning for public properties.