Specifications include, but are not limited to: a. Maintenance services are broken into three categories, residential, downtown core, and greenway. The mandatory minimum site visit frequency from June 1st – September 30th for those three categories are as follows: 1. Residential: Monthly 2. Downtown Core: Bi-weekly (once every two weeks) 3. Greenway: Monthly b. Maintenance activities for all areas are as follows: 1. Intermittent site visits (as defined above) where the following activities should be performed if the need is visibly evident, a. Watering i. Greenways are not areas requiring watering. Bioretention systems require watering for the three weeks immediately following a new planting and during the months of JulySeptember when a period of 7 calendar days has passed without a 24-hr rain event greater than a quarter of an inch.