Specifications include, but are not limited to: Uponcommencement of the project, SWCRPC will convene a project kick-off meeting. Participants will include SWCRPC, the Selected Consultant, the Town of Springfield, HCRS, and VT DEC regulatory staff. The meeting will be facilitated by the Selected Consultant. At the meeting, the Consultant will receive site background and history, goals and objectives of the Project Partners, as well as regulatory considerations and constraints. The Consultant should begin by summarizing existing conditions. The existing conditions summary should include:1.Current land use2.USGS soil classification3.Site topography (based on field topographic survey)4.Stormwater flowpath (with consideration to adjacent sites)5.Other site considerations (wetlands, hotspots, etc.)The Consultant should then identify 2-3 alternative stabilization methods/practicesand develop them to the 10% conceptual design level. The 10% conceptual designs should include the following:1.General description2.Plan view drawing, including:•Location map•Land ownership •Roads, utilities and other infrastructure•Drainage area•Site grading•Stormwater flowpath (with consideration to adjacent sites)•Design considerations and calculations•Hydrology/hydraulics