Specifications include, but are not limited to: the installation of approximately 1,885 linear feet of new 12” ductile iron waterline and appurtenances; cured-in-place pipe lining of approximately 1,800 linear feet of 18”, 15”, and 12” sewerline; rehabilitation of approximately 5 separate sewer structures and construction of approximately 3 new manhole structures; rehabilitation of approximately 6 existing stormdrain structures and construction of approximately 25 new stormdrain structures and associated drain pipe; miscellaneous repairs to various stormwater collection system components; rehabilitation and select replacement of the existing T-Stem precast concrete retaining wall, and full-width roadway reconstruction and select sidewalk and curb replacement.