Specifications include, but are not limited to: Inspection and reporting for six hoists at Waterbury Dam. a. Sub-task 1: Up to three (3) meetings with DEC staff including a project kickoff meeting, a meeting to review preliminary findings, and a meeting to discuss inspection findings and recommendations prior to delivery of the final reports. b. Sub-task 2: Examination and/or collection of all available information and records as necessary in the files of the State Dam Safety Program, and other sources to understand the history of the subject equipment. c. Sub-task 3: The selected contractor shall be responsible for the safety of their personnel while they are onsite performing the inspections and repairs. The contractor shall be required to follow all applicable State and Federal safety requirements to perform the work, including provisions such as fall protection and confined space entry. The selected contractor shall provide to the State, prior to the start of work, a basic safety plan that outlines anticipated safety issues and methods and equipment to safely complete the work. d. Sub-task 4: Perform field inspections of the two Manual Trolley Hoists. All inspections should be completed in compliance with applicable OSHA, ASME, NEC, and ANSI standards and regulations