Specifications include, but are not limited to: This project consists of the construction of a section of sidewalk along Birchcliff Parkway, and three raised intersections: Locust Street and Charlotte Street, Locust Street and Caroline Street, and Birchcliff Parkway and Cherry Lane. The construction activities will include but are not limited to grading, subbase, and paving, curb extensions, sidewalks and ADA accessible curb ramps, crosswalks, driveway reconstruction, new signs, pavement markings, new drainage structures, rain gardens, and other related items. II. SCOPE OF WORK The consultant hired to perform these services should be qualified to perform a variety of inspection, record keeping and construction engineering activities including, but not limited to: Task 1: Administration 1. Maintain communication with the MPM on a regular basis. 2. Coordinate with the Municipality, Design Engineer, VTrans and the Construction Contractor(s). 3. Review and have a thorough understanding of contract plans, specifications, estimates and contract special provisions. 4. Coordinate, schedule, lead, and provide minutes for the pre-construction conference. Coordinate, schedule and attend the Final Inspection. Coordinate, schedule, lead, and provide minutes for all other job related meetings, including monthly Construction Status meetings with the Contractor, MPM, State or Federal representatives and Municipal representatives. Coordinate with the contractor to obtain accurate schedule information.