Loading...
Skip to main content
< Back to results

Brown Schoolhouse Road Bridge Replacement


Location
Vermont
Publication Date
05/07/2020 01:12 PM EDT
Closing Date
05/29/2020 04:30 PM EDT
Issuing Organization
Town of Norwich
Solicitation Number
Description

Specifications include, but are not limited to: replacement bridge over the Charles Brown Brook within the right of way for the Brown Schoolhouse Road with a top surface consistent with the alignment and elevation of the previous bridge, bank-to-bank, assuming the following: The Contractor will be responsible for all permits. The Contractor will be responsible for the design and construction of the bridge. The bridge will have a usable width of six feet. The bridge will be designed for a minimum live load of 90 lbs/sf and a deflection criterion of l/360. The bridge will have a span of approximately 40 feet, or as otherwise recommended by the Contractor.

Get instant access

Get instant access to solicitation details & future business opportunities.

to solicitation details & future business opportunities.

Get Access

Vendor packages with access to similar open solicitations

Matching bid notifications & access to all Statewide & Group bid details

Statewide

Matching bid notifications & access to all Statewide & Group bid details

Matching bid notifications from participating agencies

Group

Matching bid notifications from participating agencies

Access participating agency bids

Basic

Access participating agency bids