Specifications include, but are not limited to: #1 the Contractor will: Collect water quality samples at biweekly intervals at the specified locations, utilizing the QAPP provided by the State Water quality samples and field sheets delivered to the drop-off collection location March 1 to September 30 $XX/sampling event #2 the Contractor will: Collect water quality samples at the specified locations in response to storm or snow events exceeding the trigger level if conditions are safe to do so. Water quality samples and field sheets delivered to the drop-off location February 15 to September 30, as conditions allow $XX/sampling event #3 the Contractor will Provide a final report to the State The report will include a tabulation of the number of samples collected during the contract period, a discussion of any problems encountered, and recommendations for any future changes to the procedures. Close of Contract $XX