This project shall provide Construction Management services for the installation of new #2 oil boiler(s) sized for summer use, initially fed from a temporary fuel oil tank. The conversion of the existing oil boilers from #4 fuel oil to #2 fuel oil, and the replacement of the existing underground oil tanks. The conversion of the existing boilers and replacement of the fuel tanks to occur during the summer and be substantially complete by mid-October 2026. 3.1. The goal is to have the ability to start serving the summer load in May 2026 with the new boiler(s) so the existing large boilers can be shut down for the summer. During this shut down the installation of the summer boilers will be completed, the existing boilers will be converted to operate on #2 fuel oil, and existing underground fuel tanks will be replaced. This will necessitate a temporary #2 fuel oil tank for the summer boiler(s) until the new underground tanks are complete. The conversion of the existing boilers and replacement of the fuel tanks shall be substantially complete by mid-October 2026.