Specifications include, but are not limited to: 2.3.10 Contractor shall regular examine, adjust, clean, lubricate as required, and if necessary, recommend repair or replacement of any parts for the lifts. 2.3.11 Contractor shall perform the following at each quarter, Check Hydraulic fluid, inspect all mounting hardware, safety functions, inspect all motors, pumps, electrical connections, doors, gates, auto openers, and closures. 2.3.12 Contractor to examine and test safety devices. 2.3.13 Contractor shall assume responsibility for damages due to their negligence. 2.3.14 Contractor shall notify the District Facility Manager or his/her designee that work is complete. 2.3.15 Contractor shall perform all tests as required and/or instructed by the District Supervisor to ensure function and/or operation.