Specifications include, but are not limited to: Beginning at a point on US Route 5 (Main Street) approximately 1000-feet north of the bridge over Sacketts Brook at the end of the existing sidewalk continuing north along the east side of US Route 5 to the intersection of Vinegar Lane, approximately 860-feet. Construction continues north and east along Vinegar Lane to the intersection of River Road, approximately 510-feet. Work to be performed under this project includes: construction of curb and sidewalk, placement of a stone fill embankment, extension of an existing concrete box culvert and construction of a concrete headwall, regrading of Vinegar Lane, ornamental lighting along Vinegar Lane, associated drainage items, and other incidental items.