Remove and Dispose Old Concrete and replace with new concrete grade 60 reinforcement splice onto existing bar 4000 psi concrete, light broom finish, saw cut & seal. 5” Depth in following section: 50’x50’. See Drawing for location. Thursday evening, demolition, prep, and pour concrete after 3:00 p.m. Friday and Saturday morning if needed for base and option items. Repair to allow facility to reopen on Monday. Remove and Dispose Old Concrete, replace crushed stone as needed for leveling, replace with new concrete and grade 60 reinforcement 4000psi concrete, light broom finish, saw cut & seal. [5” Depth in following section: 21’X18’]. See Drawing for Location. Thursday evening, demolition, prep, and pour concrete after 3:00 p.m. Friday and Saturday morning if needed for base and option items. Repair to allow facility to reopen on Monday Remove and dispose necessary asphalt, level pad with road, install new concrete pad and grade 60 reinforcement #4 @12” each way, 4000 psi concrete, light broom finish, saw cut & seal. [4” Depth approximately 460 SF). See Drawing for location. Thursday evening, demolition, prep, and pour concrete after 3:00 p.m. Friday and Saturday morning if needed for base and option items. Repair to allow facility to reopen on Monday.