Specifications include, but are not limited to: Provide and install 120VAC power distribution for each camera location as well as locations of wireless transmission equipment described later in this scope. 200Amp service at the I55 and adjacent railroad bridges, 200Amp service at the I40 Bridge – contingent on actual installation requirements yet to be determined. Route power from the distribution platform to each camera, illumination and wireless communication device location. Provide and install pole masts and bases for mounting of surveillance cameras, wireless transmission equipment and fiber distribution equipment. Pole masts to include lightning arrestor gear and adequate grounding per NEC at each pole mast location. Install UPS system provided by security contractor at the new MPD Entertainment District Precinct building at 136 Linden St. Provide and install 120VAC emergency power distribution to the UPS for the MVOSS system head end located at 136 Linden St. Route power from the UPS distribution platform to the video surveillance and fiber transmission equipment.