Specifications include, but are not limited to: The project consists of the reconstruction of the downstream earthen slope of the dam and installation of an articulated concrete block revetment system (ACB) for embankment over-topping protection. The work generally includes: excavation of the downstream slope, extension of the outlet pipe, installation of a new cast-in-place concrete toewall, placement of compacted earth embankment material and toe drain filter material, placement of the ACB system, stonefill and related work. The project also includes traffic control measures on NH32. Two (2) lane travel is required at all times and NHDOT approved traffic control measures are required. The Contractor is responsible for traffic control, shall prepare a traffic control plan and shall coordinate with the NHDOT to review and obtain approval of the traffic control plan from NHDOT prior to mobilization. The control of water, including the bypass of discharges through the project site and into the downstream channel is required at all times. All construction shall be performed in the dry. Contractor shall submit a specific control of water plan to the Engineer and NHDES for review and approval prior to mobilization.