Specifications include, but are not limited to: pause place oval (any/all demolition work except as noted; replacement of pipe under walk and replacement of headwall, exposed concrete and wood construction, asphalt paving (including any repairs to bike path, and construction of path from Arena main parking lot to Arena front door, and path to Arena back parking lot); exposed aggregate concrete pad for Leddy Park Fitness Station; minimum 6” of pre-approved clean topsoil, fined graded in all areas of disturbance; final cleanup and punch list items as directed by resident engineer. To exclude the following work by others: removal of any existing trees over 6” diameter, installation of all planting material, installation of pre-approved bark mulch