• Inspection of the sites, review of Town Codes and Standards, ANR Rivers Management requirements and standards, and FEMA’s hazard mitigation requirements. • Review attached HH Study that has been completed by the State of Vermont, each structure has multiple replacement recommendations. Determine the best recommendation and design a plan to complete. Construction to be completed in 2026. • Development of contract plans, technical specifications, final engineer’s estimate and bid documents for each structure, and assistance with the bidding process. • Information that will need to be provided to FEMA for review, including staging areas for equipment and material, access routes for movement of emergency vehicles, equipment and/or facilitation of construction, areas of proposed tree removal, and limits of expected excavation/ground disturbance • Construction phase services.