Specifications include, but are not limited to: 1. “E” -Center Building. F25,000 sf Office Building Dry system 10/15 2.5” Tyco dry valve upper mechanical room C) Inspectors test – 2. PUBLIC SAFTEY- 0384 F-27060 Forensics F-20829 87,000 sf Office Building with Lab FCI Alarm Panel 4” Wet check-Viking 4” Water control valve with damper 4-Halon systems 4” BFP Ames 2000ss Inspectors test – Attic toward street Main supply to cores F-31453 Room F-121 New-2015 6” Mod. CV-1F (R) Wet alarm valve 6” Apollo BFP DCLF4A ser. #51307 3. STANLEY HALL- 0370 Wet-F-00150 Dry F-15074- 92 Park Row 25,000 sf Office Building FCI Panel 4” Rasco dry mod D Sprinkler Valve 4” Flow switch VSR-F Tamper switches Flow switches in closet 1st floor Inspectors test- Wet basement by fire panel, dry attic