Specifications include, but are not limited to: 1. Coordinating with the Sponsor on project scope requirements, finances, schedules, operational safety and phasing considerations, site access, IFE’s, RON’s and other pertinent matters. 2. As applicable, coordinating project with local FAA personnel and other interested stakeholders to identify potential impacts to their operations. 3. Planning, procuring, and/or preparing necessary surveys, geotechnical engineering investigations, field investigations, and architectural and engineering studies required for design considerations. 1. Conducting and attending meetings and design conferences to obtain information and to coordinate or resolve design matters. 2. Collecting engineering data and undertaking field investigations; performing geotechnical engineering studies; and performing architectural, engineering, and special environmental studies. 3. Preparing necessary engineering reports and recommendations.