Specifications include, but are not limited to: sawcutting and removing the asphalt, curb and gutter, sidewalk, and waterway at Site 1 (Exhibit A,) and installing storm drain pipe, curb catch basins, and combo box. It is proposed to replace the associated sidewalk, curb and gutter, and asphalt in the disturbed project limits. The goal of the project is to make the intersection more easily passable while still retaining the storm drainage conveyance. The second intersection located at Site 2 (Exhibit A,) will involve similar activities, only the existing 4’ wide waterway is proposed to be replaced with a 6’ waterway, also with the goal of making the intersection more easily passable and to replace the degrading waterway.