Specifications include, but are not limited to: This project is to have the wastewater sewer main lines on Camp Williams cleaned and inspected by CCTV to maintain the lines and determine areas or points that need to be repaired. At project completion, a hard-copy and digital copy completion packet will be submitted to DPW with images (motion/still) of areas with damages/issues, diagrams and descriptions of the deficiencies, and location data (i.e. GIS) of the areas. We also ask that recommendations be made on how to rectify the deficiencies found. There are 27,344 LF of wastewater sewer mains with various diameters from 6”-12” that will be inspected. As a separate line item on the proposal, we would also like a bid for the cleaning and inspection of 784 LF of 4”-6” diameter wastewater sewer laterals that have seen issues.