Specifications include, but are not limited to: Task 1 – Design and Programming – The selected respondent shall provide a design submittal that includes an overall network design and panel drawings for each PLC panel and the Headworks Screen Control Panel. Respondents may assume that a copy of the existing drawings will be provided for the network and for each panel. The respondent shall provide PLC, HMI, touch screen and dialer programming as necessary for a complete and operable system. The existing programs will be made available as a reference, but all new programs shall be developed from scratch following current industry standards. As part of the project, provide a comprehensive, electronic O&M manual that includes PDF’s of all drawings and programs as well as backups of all programming files. All programming shall be well documented and organized. Task 2 – On-Site Installation & Commissioning – The WWTP and each lift station are required to operate continuously 24 hours a day seven days a week. In no way shall the replacement of hardware and software interrupt the facility operations.