Specifications include, but are not limited to: I. Upgrade or replace the existing SCADA system. It is preferred that the existing field devices, including the installed PLCs and instrumentation, be retained and integrated to a new “head end” SCADA platform. II. Development of analytical and reporting capabilities. III. Support for tablet devices for use by operators and operations management. The proposer will be expected to deliver: 1. A design for the SCADA system, including required hardware, software and communications, as described in this RFP, documenting the proposed configuration of all components at each site, to be submitted and approved prior to the commencement of installation work 2. SCADA system software, including application platform, user interface, configuration/administration tools, data archiving, reporting and alarm management capabilities, with system and user documentation. 3. Proposed equipment, procured, configured and installed in a manner conforming to approved design submittal and meeting all applicable City standards. 4. Training, instructions and documentation to enable City staff to effectively operate and maintain the system. 5. System maintenance and support for a period of a minimum of three years following acceptance of the system. 6. Services for the deployment of tablet devices to mobile operators. The tablet devices will be purchased separately by the City.