Specifications include, but are not limited to: installation of about: 883 feet of 8” ductile iron pipe waterline in the shoulder of the West side of State Street from 4500 South to Edison Avenue; 1,393 feet of 8” ductile iron pipe waterline on the East side of State Street in the sidewalk to just North of Fireclay Avenue; 127 feet of 8” ductile iron pipe connecting the new waterline from the East side of State Street to the existing waterline on Fireclay Avenue on the West side; and 800 feet of 8” waterline from the new waterline on the East side of State street through the parking lot of Sherwin Williams then turns south through their back lot connecting to the water system of Cottonwood Coves development including a new meter box.