Specifications include, but are not limited to: All merchantable and unmerchantable material must be removed from the project areas, except when indicated by FFSL project manager. The removed timber becomes the responsibility of the Contractor. If preferred, the Contractor can leave all dead material as well as live material under 5” in diameter at a FFSL designated site approximately 1 mile from the project site. This material must be cut to 12 ft lengths and stacked neatly. All felled trees must be completely removed from project site, including tops greater than 4” DBH. Dead and down logs felled from past cutting projects with a diameter of 4” and greater and a length of 5’ and longer must also be removed from the pink flagged project boundary.