Specifications include, but are not limited to: Masonry removal and replacement, exterior expansion joint removal and replacement, exterior joint removal and replacement on 3 campuses per the bid documents, specifications and drawings. The Work includes removal and replacement of all expansion and deteriorated control joints on buildings located on the Jordan, Miller and Redwood Campus locations. In addition to replacement of existing deteriorated control joints, selected mortar joints are being replaced with new control joints to help mitigation water migration and accommodate movement. Additionally, there are repairs being executed at masonry / mortar and concrete locations where there are risks of material falling and creating a life safety concern.