Specifications include, but are not limited to: A The APS midlife overhaul scope of work will include the cleaning, disassembly, refurbishment, repair (as necessary) and testing of the APS unit. B All work and testing shall be conducted in accordance with IEEE 16 and/or IEC 60287-1. C The overhaul procedure shall be in accordance with the OEM manufacturing/repair processes except where otherwise agreed. D UTA personnel shall be responsible for the removal and installation of the APS units and any associated components from the vehicles. E All mounting hardware and fasteners shall also be sourced and fitted by UTA except as otherwise specified below. F To the extent possible design improvements that have been made to the type U750DC/208AC3-28DC/P66-14/F60 APS since UTA originally purchased the SD160 fleet shall be incorporated into the overhauled units (subject to UTA approval). G The Proposer shall provide a description of its recent design and manufacturing experience in providing overhaul services for static converters/inverters on rail transit vehicles including work currently being performed as described in Part 2.03.C.