Specifications include, but are not limited to: The work includes furnishing all labor, tools, materials, equipment, transportation, and services required for construction of the above projects; consisting of the following items of work: mobilization; removal of curb & gutter; removal of concrete sidewalk, flat work and driveway approaches removal of asphalt and roadbase; installation of concrete curb and gutter; sidewalk and driveway approaches and handicap ramps; roadway surface milling; installation of asphalt overlay surfacing complete with fabric; and miscellaneous landscaping; and all appurtenant work in accordance with the Drawings and Specifications prepared by the Engineer, CEC, Civil Engineering Consultants, PLLC.