Specifications include, but are not limited to: Schedule A: South Leg/America First - River Heights Drive. The Work to be performed for this schedule is located on River Heights Drive & South Jordan Parkway Intersection and generally includes the expansion of the road to add a left-turn lane, but it is not limited to Mobilization; Traffic Control; Demolition of Existing Concrete and Asphalt; Construction Surveying; Road Excavation; Furnishing & Installation of Untreated Base Course; Furnishing & Installation of HMA – DM ¾” PG 58-28; Furnishing & Installation of Concrete Works Such As Sidewalk, Curb, Gutter, and ADA Accessible Ramps; Removal of Trees and Stumps; Restoration of Landscape and Irrigation System; Paving Marking Paint & Thermoplastic; Furnishing and Installation of Signal Heads and Poles; All Labor, Supplies, Tools, Equipment, Parts, Rentals, Fuels, Utilities, Subcontractors, Suppliers, Mobilization, and all other Costs including Overhead and Profit. All work must comply with APWA, UDOT, and South Jordan City standards. Schedule B: 2700 W Roadway Improvements. The Work to be performed for this schedule is located on 2700 West from 11400 S to 11625 S and generally includes the Construction of Roadway Improvements, but it is not limited to; Mobilization; Traffic Control; Construction Surveying; Site Clearing; Demolition of Existing Concrete and Asphalt; Removal of Trees and Stumps; Road Excavation; Furnishing & Installation of Untreated Base Course; Furnishing & Installation of HMA – DM ¾” PG 58-28; Furnishing & Installation of Concrete Works such As Sidewalk, Curb, Gutter, and ADA Accessible Ramps; Furnishing and Installation of Storm Drain Pipe and Catch Basins; Reconstruction of Concrete or Asphalt Driveways; Furnishing and Installation of Irrigation Appurtenances such as Pipe (Various Materials and Sizes), Diversion Boxes, Junction Boxes; Appurtenances for Relocation of Rocky Mountain Power Utility including Conduits, Vaults, Sleeves, Secondary Boxes