Specifications include, but are not limited to: The removal of existing walls and doors at the fronts of the four existing racquetball courts. Modifications of adjacent walls and ceilings to permit the installation of the new work. Selective demolition and patching of areas of gypsum board, floated walls and ceilings will be required. Modification of floor along old wall to be removed. Removal and replacement of areas of lay-in ceiling. Relocation of electrical outlets. Installation of new glazed wall and door system, steel beams and columns and alternate bids to replace front wall panels in two courts as well as layin acoustical ceiling in hallway. Install new wood ramp and finishes in courts and hallway. Contractor to coordinate logistics of removal and replacement to minimize building disruption.