Specifications include, but are not limited to: LED Beacon EA Includes beacon housing, LEDs, integrated pedestrian confirmation pilot lights, integrated pedestrian confirmation pilot light obscuring caps, and side-of-pole mounting kit. See Note 1 below. Wiring from the Controller to the LED Beacon will be Contractor-Furnished; AC Controller EA Includes controller, cabinet, DIN rail circuit breaker, AC-to-DC converter, radio, radio antenna, associated internal wiring, and all other components for an operational controller. Also includes side-of-pole mounting kit. See Note 1 below. Push button and wiring from the push button to the Controller will be Contractor-Furnished; Solar Controller EA Includes controller, cabinet, radio, radio antenna, associated internal wiring, and all other components for an operational controller. Also includes side-of-pole mounting kit. See Note 1 below. Battery, push button, and wiring from the push button to the Controller will be Contractor-Furnished