Specifications include, but are not limited to: 1- Saw cut existing asphalt 2- Traffic Control 3- Remove and dispose of existing asphalt and excavated trench materials 4- Mobilization & project support 5- Hot tap existing line, Install foot valve and hydrant assembly (Complete) 6- Install raise & collar valve box, Install pipe, Hydrant, Thrust Blocks, pipe bedding and Import trench backfill materials. 7- Install 3/4 “ Culinary water service complete (Meter not included) Connect to hydrant line after it crosses Erda Way. Install meter box assembly and run waterline to the building. 8- Connect new water line (3/4”) and run it inside the building, run it overhead to the utility closet and connect the water line to the existing building service. 9- Asphalt patching in the road and parking lot (Includes: Road base)