Specifications include, but are not limited to: Remove all existing membrane roofing and associated materials, including all perimeter drip edge, flashings at all roof penetrations, and insulation down to, but not including the existing original tar and gravel roof. Any remaining loose gravel should also be removed. Coordinate with UTA’s Project Manager to schedule removal of evaporative coolers by others to allow for proper and complete removal of old roofing, and installation of new roofing on all builtup curbs. Existing sheet metal curb caps and flashings shall be carefully removed by contractor and protected while stored onsite, to be re-installed by contractor after new roofing and flashings have been installed. Install a new TPO membrane roof system, (approximately 54,200 square feet), including new drip edge for the entire roof perimeter, new flashings at all roof penetrations, new 1” thick Poly ISO insulation for the entire roof, and new anti-slip protective walkways at the roof hatch and around all rooftop HVAC equipment.