Specifications include, but are not limited to: 1. (70%) All lawns must be cut on a weekly basis; days between cuttings must not exceed 7 days. All cutting will be completed the same day as started. Grass will be cut to a length of 2" to 3” except for the first and last cuttings which will be 1 " long. Any variations will be as instructed by the Program Manager. 2. (15%) All lawns must be edged and trimmed around sidewalks, driveways, cement retaining walls and shrub beds. Trimming/edging will include grass and/or weeds in the cracks in the sidewalks, curb and gutter, parking areas and driveways. All sprinkler heads must be kept clear of grass (grass trimmed below heads). Pop up sprinkler heads will be cleared as required. All clippings will be removed by the use of grass catchers and will be disposed of in a legal manner. All clippings and debris will be removed on the day of service. Grass/debris cannot be blown onto or left in roadways, parking areas or track right-of-way