Specifications include, but are not limited to: 1. Vinyl Stair Rise/Run/Skirt a. Contractor shall remove all stair rise/run/skirt and associated adhesive mastic Rooms: 109, 110, 112, 121, 122, 123, 124, 125, 126, 127, 128, 129, 130 (see the attached floor plans). This material contains 3% chrysotile asbestos. There is approximately 1,240 square feet of vinyl stair material to be removed. These materials are currently non-friable. 2. Insulation Pin Adhesive (Adhesive – Fiberglass Insulation Panel Fastener) a. Contractor shall remove all Tan Pin Adhesive from Room 018. This material contains 18% chrysotile asbestos. There is approximately 800 square feet of material to be removed. This material is currently nonfriable. 3. Hood Chemical Lining a. Contractor shall remove all Transite Board from the Chemical Hood in Room 011. This material contains 18% Chrysotile asbestos. There is approximately 30 square feet of material to be removed. This material is currently non-friable. 4. Sink Undercoating a. Contractor shall remove the sink in Room 208. This material contains 15% Chrysotile asbestos. There is one sink to be removed. This material is currently non-friable.