Specifications include, but are not limited to: 1. Clearing and grubbing existing vegetation where a new pump station will be constructed. 2. Connecting to an existing 30” steel pipe stub out from an existing flow control valve vault owned by the Jordan Valley Water Conservancy District (JVWCD). Most of the new pipe on the suction side of the new pump station will be owned by JVWCD and will be constructed according to JVWCD standards. 3. Construction of two valve vaults for isolation of 30” steel and 30” ductile iron pipe. 4. Construction of new 1,950 square foot pump station that will include four 400 HP pumps and associated mechanical and electrical equipment (including a 1,500 kW backup generator). 5. Installation of a 4,000 gallon surge tank. 6. Site improvements including limited storm water and access improvements. 7. Replacing the roof and fascia of an existing pump station along with painting the walls of the existing building.