Specifications include, but are not limited to: 5.1 All work performed safely. Staff on the job site must be in full compliance of all State and Federal safety requirements along with meeting UDOT’s Safety and Health Manual 5.2 Mandatory minimum technical specifications/scope of work includes Attachments. 5.3 Contractor shall provide all properly qualified, certified, and/or licensed personnel, materials, equipment, safety devices, and apparel necessary to complete the work. 5.4 All work performed shall be completed in accordance with State laws, standards, regulations of all governing authorities in accordance with UDOT Standard Specifications, Standard Drawings, and project documents. 5.5 Coordination of Work A. All work shall be coordinated through and directed by the State Representative. Each project may have a different State Representative. B. Sub-consultants: The Contractor shall not sub-contract more than 25 percent of work based on cost without written approval from the State Representative. All sub-contractors shall meet the Mandatory Qualifications and Requirements included in this contract. C. Project Cap: Maximum value per project is $2.5 million dollars.