Specifications include, but are not limited to: As part of the design of utilities into the school, the necessary conduits that feed into the school for Telecommunications (4) 4” conduits are needed. They are to be solely dedicated to the Technology department’s current and future utility (Century Link and Fiber Optic providers) needs. The primary two conduits are to be run from a common use vault/hand hole (for providers to use now and in future) on the street side utility easement to the MDF/EF. The secondary set of conduits pathway will run from a common use vault/hand hole (for providers to use now and in the future) to the MDF/EF as well and will be determined by the electrical engineers and the Technology dept during the designing phase of the project. One conduit in both sets of 4” will remain empty while the other has (3) smooth wall 1 ¼” innerduct installed. The conduits shall protrude no more than 8" above floor into Network rooms and innerduct is to extend no more than 18" from the conduit and secured to the wall in using unistrut and clamps.