Specifications include, but are not limited to: furnishing all labor, tools, materials, equipment, transportation, and services required for construction of the above project; and mobilization; obtaining all bonds and insurance, saw cutting asphalt & concrete, modification to the existing concrete vault which houses the well motor and pumping facilities, electrical modifications to the well housing vault, removing and disposing of existing asphalt and trench material; furnishing and installing approximately 1,950 feet of 10-inch diameter pvc pipe with 4’ diameter manholes;furnish and installing approximately 475 feet of 12- inch diameter rcp piping, storm water junction boxes, chain link fencing, furnish and install a pond inlet and overflow/outlet structures, handicap ramps, curb & gutter and waterways, asphalt trench patching, irrigation and sod repair, placement of large stones asrip-rap and all appurtenant work.