Specifications include, but are not limited to: Installing 8,300 feet of 36-inch DIP in American Fork City streets, beginning at 200 East and Main Street, running east to 600 East (Caveman Boulevard), and running north to 700 North.Work includes installing new culinary service connections and fire hydrants within the Project area. Existing culinary water lines must be reconnected to new 36-inch DIP. Also, included is the reconnecting and looping of existing utilities including irrigation, sewer, storm drain, and gas. Work to be performed includes valves, fittings, meters, excavation, backfilling, curb and gutter, road reconstruction and asphalt repaving. The Work features boring underneath a UTA railroad on Main Street, which will require steel casing and carrier pipe